In this Killara unit, hidden slab delamination and corroded rebar under timber floors posed serious structural and disruption risks—yet the client needed zero tenant moves.
PM Mandate: “Fix the slab safely with no tenant moves, no noise, and no extra costs.”
We ran this live-site refurbishment with full transparency:
Targeted Breakout & Steel Prep
• Removed delaminated concrete, treated reinforcement to stop corrosion
ACRA-Compliant Reinstatement
• High-strength, shrinkage-compensated mortar pour per guide
Trowel-Finish for Direct Flooring
• Smooth topcoat ready for immediate floor relaying