Everything your team needs to verify completion — without chasing a single file.
This is an example of the format, structure, and detail we provide on every job.
You shouldn’t have to chase your builder to prove a job was done properly.
But most “handover packs” fall apart when the engineer asks for documentation, the strata manager needs evidence, or a legal dispute surfaces six months later.
This is what happens when builders finish the job… but don’t close it.
We built this Closure Pack to do what others won’t:
This is the standard we deliver on every project — whether it’s a balcony patch or a $1M façade remediation.
A Closure Pack is designed to give engineers, strata managers, legal teams, and PMs the full picture — in one file.
This sample confirms that a project is:
✅ Complete
✅ Compliant with Australian Standards:
‣ AS 4654.2 – External Waterproofing
‣ AS 3600 – Concrete Structures
‣ ACRA – Guide to Concrete Repair
✅ QA-tracked and engineer-approved
✅ Handover-ready, with all documents included