Remedial Waterproofing Case Study β Built Once. Built Right.
π§ What Happens When Waterproofing Fails in a Live Commercial Building?
- Cracked tiles.
- Tile Delamination.
- Moisture creeping into occupied spaces.
- Concrete deterioration beneath the surface.
The internal swimming pool at Shelley Street had failed β and it wasnβt just cosmetic.
Water had breached the membrane system and begun tracking into adjacent living areas.
Engineers were brought in to investigate and confirmed:
- π§± Delaminated tile beds
- π Substrate moisture ingress
- β οΈ Structural deterioration beneath the membrane
A declared waterproofing design was issued to AS 4654.2 with works to be executed live, under engineered supervision. The owners had one clear goal:
βGet it rebuilt in winter β so itβs ready by summer. No dramas.β
π§° The Solution (Delivered by Atomic)
We executed the entire remediation in sequence:
- β
Full strip-out of tiles and failed membrane
- β
Drum testing + concrete repairs to ACRA guidelines
- β
Multi-stage membrane system: Ardex WPM 300/002