Remedial Waterproofing Case Study β€” Built Once. Built Right.


🧠 What Happens When Waterproofing Fails in a Live Commercial Building?

The internal swimming pool at Shelley Street had failed β€” and it wasn’t just cosmetic.

Water had breached the membrane system and begun tracking into adjacent living areas.

Engineers were brought in to investigate and confirmed:

A declared waterproofing design was issued to AS 4654.2 with works to be executed live, under engineered supervision. The owners had one clear goal:

β€œGet it rebuilt in winter β€” so it’s ready by summer. No dramas.”


🧰 The Solution (Delivered by Atomic)

We executed the entire remediation in sequence: