Most remedial jobs don’t blow up because of the design.
They blow up because the builder:
If you’ve ever had to defend your own design, answer for a builder you didn’t choose, or fix a scope mid-job, this is for you.
Most builders don’t have a process problem — they have a discipline problem.
They don’t hold the spec.
They don’t protect the client.
They don’t build like they’ll be audited.
This isn’t about capability.
It’s about culture.